Hardware upgrade maintenance 11/1/18
Posted: Wed Oct 31, 2018 5:09 am
Maintenance is: COMPLETE!!
Estimated start time is 1500 EDT and expected to finish no later than 1700 EDT.
This will be a hardware only maintenance, no client update is required at this time.
Update: Thank you all very much for your patience during the very extended hardware maintenance.
Server upgrades:
Future server upgrades:
Estimated start time is 1500 EDT and expected to finish no later than 1700 EDT.
This will be a hardware only maintenance, no client update is required at this time.
Update: Thank you all very much for your patience during the very extended hardware maintenance.
Server upgrades:
- We are now running on a H700 raid controller, allowing full 6Gb/s speeds on our SATA SSD drives.
- Power supplies were upgraded from a single 540w to dual 870w for redundancy.
- iDRAC was added to the server for ease of future firmware updates and better host connectivity.
- Various firmware updates.
- Microsoft updates.*
Future server upgrades:
- In the next week the server will go in to a more permanent home inside a rack.*
- The server will be added to an UPS once a 30 Amp circut is installed.*